What a survey costsWhat the report must containHow the survey sets your depth, yield and pump sizeChoosing and checking the surveyorAfter the surveyKenyan drillers publish KSh 50,000 to 80,000 for a hydrogeological survey in 2025, and WRA's own rate is KSh 40,000 per site plus staff days, laboratory costs excluded. The report is required when the borehole will have a motorised pump, including a solar one.
Part of the Jua Pumps guides. The survey is the first step of a borehole, before the permit and the rig. See the full cost chain in Borehole drilling cost in Kenya. When the hole is drilled, compare solar borehole pumps, try the sizing calculator, or read how borehole solarization works.
What a survey costs
Published prices differ, and they do not always cover the same work. Some are a desk study, some add field measurements.
| Source | Survey price | Year |
|---|---|---|
| Knight & Hammer Contractors | KSh 50,000 to 80,000 | 2025 |
| Hydropaths | KSh 50,000 to 65,000 | 2025 |
| BeyondForest | From KSh 15,000 in the text, KSh 50,000 to 150,000 in its FAQ | 2024 |
| FarmBizAfrica (driller price list) | KSh 50,000 to 100,000 | June 2020 |
| WRA, official rate (Water Resources Regulations, 2021) | KSh 40,000 per site, plus staff days at the contracted consultancy rate and mileage, laboratory analysis excluded | 2021 |
The spread is why you should ask what the price includes. A low figure may be a desk study that you cannot attach to a WRA application. Ask for the price of a signed report in the Fourth Schedule format, with the geophysical readings, in writing.
What the report must contain
The Regulations list the content of a hydrogeological survey report. In plain words, it covers:
- Your name, the location and what you plan to do.
- Climate, geology and hydrogeology of the area.
- The neighbouring boreholes: where they are, how deep, how many, their age, current use and abstraction.
- The prospecting methods used (remote sensing, geophysics, cross sections) with the data, and the aquifer’s transmissivity, borehole specific capacities, storage and recharge.
- An assessment of water quality against national standards, and of how much groundwater is available.
- The effect of your borehole on the aquifer and on other users nearby.
- Recommendations: the borehole position as coordinates on a sketch map, the recommended depth and the largest diameter, and the spacing of boreholes in the area.
That last point is the one that matters to your budget. Every sentence in the report becomes a line in your drilling quote.
How the survey sets your depth, yield and pump size
Depth. The surveyor reads the neighbours. At Enduata in Kajiado, the survey lists nearby boreholes at 100 to 167 m deep with water struck between 20 and 106 m and recommends drilling to the maximum depth to tap all the local aquifers, which sit in small, isolated pockets of weathered or fractured rock. In Karen, Nairobi, neighbouring boreholes in the Bogani Park survey (May 2022) run from 124 to 325 m, and the survey recommended 360 to 400 m for a replacement. Depth multiplies your drilling bill: see the per metre rates and the depth guide.
Yield. The same two surveys list neighbouring yields. Enduata: roughly 1.5 to 10.5 cubic metres an hour. Bogani Park: 3 to 10.08 cubic metres an hour. Your pump cannot pull out more than the borehole gives. The survey gives an estimate, and the test pumping after drilling gives the real number.
Pump size. A solar pump is sized from the water level while pumping, the climb to your tank and the daily volume you need. The survey’s expected yield and water level are your first draft, then the test pumping report replaces them. Use the sizing calculator with the depth and daily volume. For reference, the Solarpex 800 W kit has a published maximum head of 80 m and the Solarpex 1,500 W kit 168 m, so the survey’s depth range already points to one or the other. The Premier AC/DC kit lists 100 m.
Choosing and checking the surveyor
- The Regulations require the report to be prepared by a qualified and licensed water sector professional. Ask for the licence number and check it with WRA.
- Ask whether the quoted price is for a signed WRA-format report, and who files it.
- If the driller offers the survey with the drilling, ask who signs the report. The Regulations also require a qualified professional to supervise construction of a borehole that gets a motorised pump.
- A free survey is possible (Boreholes.co.ke, 2026). BeyondForest says it takes KSh 1,000 off a survey booked through its partner. Either way, read the report before you accept the depth.
After the survey
Next you apply to WRA with the report: see the WRA permit guide. Before you choose pump materials, test the water, since salt and fluoride change the choice. When the borehole is tested, get a quote for a solar pump. We pass your request to one EPRA-licensed installer and tell you who before sharing your details.
Pumps that fit
Sources
- Water Resources Regulations, 2021 (Legal Notice 170), Second and Fourth Schedules
- Knight & Hammer Contractors, Cost of drilling a borehole in Kenya (2025)
- Hydropaths, Drilling a borehole in Kenya: requirements and cost
- BeyondForest, Borehole drilling price in Kenya (Oct 2024)
- FarmBizAfrica, drilling prices (4 June 2020)
- Boreholes.co.ke, Borehole drilling in Kenya guide (2026)
- Empserve, hydrogeological survey report, Enduata, Kajiado (Jan 2024)
- NORKUN Intakes, hydrogeological survey report, Bogani Park, Karen (May 2022)