Solar water pump installation in Kenya

A solar pump is only as good as its installation. This page explains what an EPRA-licensed installer does on site, what the licence classes mean, and what a written quote must list before you pay.

Updated 28 Nov 2026 · 7 min read By Peter Kamau
A technician wiring solar panels
On this pageWhat the installer does on siteA site checklist you can useEPRA licences in plain wordsWhat a good quote listsWhat it costsHow long it takesHow we help
The short answer

Kenyan sellers list pumps and kits without installation, and no installer has published a rate card to us, so we cannot quote a labour price. What we can tell you is what the quote must contain and which EPRA licence to ask for: T1, T2 or T3 for technicians, C1 for contractors.

What the installer does on site

Installation is more than bolting panels to a frame. A competent installer:

  • Surveys the site. Checks the borehole or water source, the tank position and the shade-free spot for the panels.
  • Confirms the sizing. Compares your daily water and total lift with the pump curve. See the sizing calculator for a first estimate.
  • Fits the pump and cable. Lowers the pump at the depth the driller recommends and joins the cable with a waterproof joint. A submersible cable of the right section avoids voltage loss.
  • Lays the delivery pipe. HDPE pipe to the tank or the field, with the right pressure class.
  • Mounts the panels. On a fixed frame, tilted towards the equator, secured against theft.
  • Wires and earths the system. Earthing and lightning protection are part of the job, not an extra.
  • Fits protection. A level probe or float switch to stop the pump running dry or overfilling the tank.
  • Commissions and hands over. Test-pumps, shows you the controller, and gives you the paperwork.

A site checklist you can use

Before the installer leaves, check each line:

  1. The panels are bolted or welded to a frame, not just leaning.
  2. All cable joins are sealed and the cable is clipped or buried, not lying in the sun.
  3. The pump controller is the model the pump maker specifies.
  4. Earthing is done, and you can see where.
  5. A float or level protection is fitted.
  6. The pipe is secured at bends and at the tank inlet.
  7. You have seen the pump deliver water at the tank.
  8. You have the warranty terms, the serial numbers and a phone contact in writing.

EPRA licences in plain words

EPRA, the Energy and Petroleum Regulatory Authority, licenses solar work under the Energy (Solar Photovoltaic Systems) Regulations 2012 (or any replacement). In summary, as we read the regulation and EPRA’s June 2026 notice:

Licence Who What it covers
T1 Technician Small systems, up to 100 Wp
T2 Technician Medium systems, may include an inverter
T3 Technician Advanced systems, including grid-connected and hybrid
C1 Contractor Design and installation, and the contractor must have a T3 technician available
V1 Vendor Design, sale, distribution and installation, with a T2 technician on staff

The June 2026 notice says technicians who install, test, maintain or repair solar PV systems must hold a T1, T2 or T3 licence. We read the class descriptions in summaries of the regulation and have not been able to open the full regulation text, so the capacity limits above may have been revised. We also could not confirm whether EPRA treats a solar pump with no battery as a PV system for licensing. In practice, a pump powered by panels of several hundred watts is a job for a licensed technician.

Licence classes and fees can change. Check the current EPRA notice before you rely on a class.

What a good quote lists

A quote you can compare has these lines:

  • Pump brand, model, power and maximum head.
  • Controller brand and model.
  • Panel brand, watts and number.
  • Cable section and length. Pipe diameter, pressure class and length.
  • Frame and anti-theft measures.
  • Tank, if included, with its size.
  • Labour, separate from parts, and any transport charge outside Nairobi.
  • The installer’s name, EPRA licence class and number.
  • What the warranty covers and for how long.
  • The payment schedule.

If a quote only says “solar pump system, one lump sum”, ask for the list.

What it costs

Parts: see the dated prices on the borehole pump page, surface pumps and pump kits. For labour, no installer has given us a price list, so we show none. The only installed prices we found are for drip systems: Grekkon lists KSh 33,000 for a quarter-acre drip kit and KSh 135,000 for a one-acre kit, both installed (seen 28 Nov 2026). They show the order of magnitude for irrigation work, not for a pump. See drip irrigation.

How long it takes

No source gives a standard duration, and we do not guess. A good installer gives you dates for the survey, the delivery and the handover in the quote.

How we help

We pass your request to one EPRA-licensed installer and tell you who before sharing your details. We do not install and we do not take payment for the work. Read how it works, then see borehole solarization for the full job, and paying safely with M-Pesa before you send any money. To check a licence, use the EPRA licence check.

Pumps that fit

Solarpex · AC/DC hybrid 800 W AC/DC, 80 m head
800 WPower80 mMax head5,000Flow L/h
From KSh 46,000 Seen 28 Nov 2026 · skywave.co.ke
Get a confirmed quote
Solar borehole pumps

Sources

Questions

How much does solar pump installation cost in Kenya?
We do not have a published installer rate card, so we give no labour figure. Kit and part prices are on the product pages. The only installed prices we found are for drip kits: Grekkon lists a quarter-acre drip kit at KSh 33,000 and a one-acre kit at KSh 135,000, both installed. Ask for a quote that separates parts from labour.
Which EPRA licence must my installer hold?
EPRA's June 2026 notice says solar PV technicians who install, test, maintain or repair systems must hold a T1, T2 or T3 licence, and contractors a C1 licence. Whether a pump-only job counts as a PV system for licensing is not confirmed. A system with panels is safest done by a licensed technician or contractor.
How long does installation take?
We have no published timeline. Ask the installer for a written schedule: survey date, delivery date, installation date and handover date.
Can I check an installer's licence?
Yes. Ask for the licence number and class, and check it with EPRA. Our EPRA licence check page explains how.
Do I pay before or after installation?
That is agreed between you and the installer. Never pay the full amount before you have seen the quote in writing. Read how to pay safely with M-Pesa.

Get a confirmed quote

Free and without obligation. We pass your request to one EPRA-licensed installer in your county, and tell you who before we share your details.

Common:
We need the county to find a licensed installer near you
What the water is for
Pick all that apply.
Please tick the box so we can pass on your request
No payment now. No spam calls.
What happens next
1We read your request and choose one EPRA-licensed installer who works in your county.
2We tell you who it is. Only then do we share your name, phone and county with them.
3The installer checks your borehole and sends a written, itemised quote. You decide.